Plan an office move about 12 weeks before your move date. Start earlier if your lease requires longer notice, the new space needs build-out, or furniture has to be ordered. That window is a planning rule of thumb, not a regulation. Your real deadlines come from two places: the lease dates at both ends, and the access rules of both buildings.
This office moving checklist turns those two constraints into a week-by-week plan. It is written for the office manager or operations lead at a small or mid-sized company running a first office relocation. Every phase has an owner and a "done when" condition, so you always know whether it is safe to move on.
How Far Ahead to Start Planning an Office Move
Work backward from two fixed dates. The first is the day you must be out of the current space, set by your lease expiration or surrender date. The second is the first day you can legally access the new space, set by the new lease's commencement or early-access clause. The gap between them is your move window.
The second constraint is building access. Both buildings set rules for when movers can work, which entrance and loading dock they use, and whether the freight elevator must be reserved. Some buildings also require a certificate of insurance (COI) from the mover before the crew can enter. You cannot pick a move date until you know these rules.
Q: How far in advance should you plan an office move?
A: Plan for roughly 12 weeks for a small office moving into finished space, and start earlier when construction, new cabling, or furniture orders are involved.
Before anything else, name one person as the move lead. That person owns the schedule, the vendor contacts, and the decision log. When nobody owns a decision, it waits, and waiting is what pushes a move date.
12 to 8 Weeks Out: Scope, Budget, and Lease Dates
This phase answers one question: what exactly is moving, and by when? Everything later depends on it.
- Name the move lead and a budget approver. Keep the approver list short so decisions don't stall.
- Confirm lease dates in writing. Record the vacate date, the new-space access date, and any notice deadline in the current lease.
- Read the restoration clause. Many leases require tenants to remove cabling, fixtures, or signage before surrender. That work needs its own time slot.
- Request the building rules packet from both properties. Ask for move hours, COI requirements, elevator and dock booking procedures, and floor-protection rules.
- Build a rough inventory. Count workstations, file cabinets, IT equipment, and shared furniture.
- Order internet service at the new address. Internet service provider (ISP) installation can involve a site survey and building permission, and lead times vary by provider and property. Ask for a confirmed install date, not an estimate.
- Draft the budget. Start from a breakdown of office moving costs and the line items to budget for as a framework.
Owner: Move lead, with leadership sign-off.
Done when: Scope and budget range are approved, both lease dates are confirmed in writing, and both buildings' rules are on file.
8 to 6 Weeks Out: Hire the Commercial Mover and Lock the Date
A commercial mover is a moving company that handles office furniture, workstations, files, and equipment rather than household goods alone. Give every mover you contact the same inventory so their estimates compare fairly.
- Request an on-site or video survey. Estimates based on a walkthrough reflect real access conditions.
- Work through the key questions. Use this list of questions to ask when hiring a moving company to compare answers side by side.
- Verify credentials. Take the time to verify the mover's license and insurance before signing anything.
- Clarify scope. Confirm who disassembles workstations, who packs common areas, and who protects floors and elevators.
- Match schedules. Confirm that the mover's available days and hours fit your building's permitted move hours. Not every mover schedules evening or weekend jobs.
- Separate the COI from protection for your belongings. A COI shows the mover's liability coverage to the building. It does not set how much the mover pays if your equipment is damaged. Ask what basic liability covers and what optional added coverage costs.
Q: How do you check an interstate mover's operating authority?
A: Confirm the current requirements with the relevant authority.
Once the mover is booked, submit the COI to building management right away. Ask management for its exact certificate-holder wording first, so the document isn't returned for corrections. Then reserve the elevator and dock at both addresses; here is how to reserve the freight elevator step by step.
Owner: Move lead.
Done when: The estimate is signed, the date is fixed, both buildings have approved the COI, and elevator and dock reservations are confirmed in writing.
6 to 4 Weeks Out: Floor Plan, Labeling System, and Furniture Decisions
The floor plan is the document the crew follows on move day. If it is vague, the crew makes placement decisions for you.
- Finalize the floor plan. Number every zone, office, and desk in the new space.
- Build a labeling plan. Each label should show floor, zone, and desk number, matching the plan exactly. Color-coding by floor or department speeds up unloading.
- Assign every employee a desk number. Staff will write it on their own boxes in the final week.
- Appoint department captains. One person per team answers packing questions and checks that items are labeled.
- Close the keep-or-go list. Decide which furniture moves, which is sold or donated, and which is recycled. Furniture decommissioning, meaning removal of pieces you're not keeping, needs pickups scheduled before move day.
- Plan for overflow. If new furniture arrives late or the space isn't ready, sizing short-term storage for overflow furniture prevents a scramble.
- Order packing supplies. Confirm whether the mover rents crates and what boxes, tape, and labels cost.
Modular workstations deserve special attention. Every bolt, bracket, and monitor arm should go into a bag labeled with the desk number it came from.
Owner: Move lead and department captains.
Done when: The final floor plan is printed, every employee has a desk number, and the furniture disposal list is closed with pickups booked.
4 to 3 Weeks Out: IT, Phones, and Data Cutover
IT cutover is the switch from your old network and phone setup to the new one. It is the part of the move most likely to decide whether staff can work on their first morning.
- Reconfirm the ISP install date. Ask for the circuit to be live and tested before move day.
- Check cabling at the new space. Confirm network drops, the patch panel, and wireless coverage match the floor plan.
- Plan the server rack move. Your IT lead or vendor should handle shutdown and disconnection. The mover transports the equipment.
- Back up everything. Verify a full backup before any equipment is powered down.
- Map and label every cable. A port map lets IT rebuild the network quickly at the new address.
- Schedule the phone number move. Coordinate with your phone provider on porting dates.
- Update 911 location data. Update the registered address when the phones move.
- List the other systems. Printers, access badges, alarm codes, and security cameras all need a plan.
Owner: IT lead or managed IT vendor.
Done when: The new circuit is tested live, the port map is complete, the backup is verified, and the phone porting date is scheduled.
3 to 2 Weeks Out: Notify Staff, Clients, Vendors, and the Post Office
An office move communication plan answers four things for each audience: what they need to know, when they need it, who tells them, and through which channel. Write it as a simple list and assign a sender to each line.
| Audience | What they need | Who sends it |
|---|---|---|
| Staff | Move date, packing deadline, desk number, new access and parking details | Move lead |
| Clients | New address, effective date, any service interruption | Account owners |
| Vendors and suppliers | New delivery address and date | Operations |
| Bank, insurer, payroll | Updated business address | Finance |
| Forwarding from the old address | Move lead | |
| Government agencies | Change of business address | Finance or owner |
Q: Who do you notify when moving offices?
A: Notify staff, clients, vendors, your bank and insurer, USPS for mail forwarding, and confirm the current requirements for a change of business address with the IRS.
Also update your state business registration, professional licenses, website, online listings, and printed materials.
Owner: Move lead, with finance and account owners.
Done when: Every row in the plan has been sent, and the USPS and IRS updates are filed.
The Final Week: Pack-Out, Purge, and Building Confirmations
The last week is about closing gaps, not starting new tasks.
- Set a desk-packing deadline. Staff pack personal items and desk contents, then label each box with their desk number.
- Purge before you pack. Shred sensitive documents securely rather than moving them.
- Reconfirm with both buildings. Check elevator times, dock access, security contacts, and that the COI is still on file.
- Arrange truck parking. Street parking often needs a permit; this guide on where a moving truck can park in Boston covers the options for Greater Boston offices.
- Post signs at the new office. Tape zone and desk numbers in place so the crew can match labels on sight.
- Send a move-day contact sheet. List the move lead, IT lead, mover's crew lead, and building contacts with phone numbers.
For tasks that overlap with any move, such as supplies and final-day prep, a general moving checklist is a useful cross-check.
Owner: Move lead and department captains.
Done when: Every desk is packed and labeled, both buildings have confirmed in writing, and the contact sheet is distributed.
Move Day: Roles, Access, and the Walkthrough
Move day runs on the hours your buildings allow. Some permit moves during business hours; others restrict them to evenings or weekends.
Assign clear roles before the crew arrives:
- Origin lead: Walks the old space with the crew lead, photographs existing damage, and confirms floor and elevator protection is in place.
- Destination lead: Stands at the new entrance with the floor plan and directs every labeled item to its zone.
- IT lead: Supervises the server rack and network equipment from shutdown to reconnection.
- Building contacts: Security and property management at both addresses, on call for elevator or dock problems.
Before leaving the old space, sweep every closet, kitchen, storage room, and server closet. Photograph each empty room for the lease surrender record.
Owner: Move lead, with origin and destination leads.
Done when: Every labeled item is placed, the old space is empty and photographed, and keys and badges are collected.
Week One in the New Office: Unpack, Punch List, and Close-Out
A punch list is a running list of fixes to finish after the move. Start it on the first morning and keep one shared copy.
- Unpack and test. Staff unpack their own desks and confirm computers, phones, and printers work.
- Log every issue. Record damaged items, missing boxes, furniture adjustments, and IT problems on the punch list.
- Report damage in writing, promptly. For interstate moves, confirm the current claim-filing deadline with the relevant federal authority. Report issues as soon as you find them anyway, while evidence is fresh.
- Surrender the old space. Complete restoration work, return keys, and do a final walkthrough with the landlord.
- Reconcile the budget. Compare the final invoice to the estimate and note any changes in scope.
- Hold a short retrospective. Record what worked for the next office relocation.
Owner: Move lead.
Done when: The punch list is closed, the old lease is surrendered, and the final invoice is reconciled.
The Full Checklist at a Glance
| Phase | Key tasks | Owner | Done when |
|---|---|---|---|
| 12–8 weeks out | Name move lead, confirm lease dates, get building rules, inventory, order ISP, draft budget | Move lead + leadership | Scope approved, dates and rules in writing |
| 8–6 weeks out | Survey and hire mover, verify credentials, submit COI, reserve elevator and dock | Move lead | Contract signed, COI approved, reservations confirmed |
| 6–4 weeks out | Floor plan, labeling plan, desk numbers, furniture decisions, supplies | Move lead + captains | Plan printed, disposal list closed |
| 4–3 weeks out | ISP test, cabling, backup, port map, phone porting, 911 address | IT lead | Circuit live, backup verified |
| 3–2 weeks out | Staff, client, vendor, USPS, and IRS notifications | Move lead + finance | Every notice sent and filed |
| Final week | Desk pack-out, purge, building reconfirmation, parking, signage | Move lead + captains | Desks packed, buildings confirmed |
| Move day | Origin and destination walkthroughs, IT supervision, final sweep | Move lead + IT lead | Everything placed, old space empty |
| Week one | Unpack, punch list, damage reports, lease surrender, close-out | Move lead | Punch list closed, invoice reconciled |
Mistakes That Cost Offices a Monday Morning
Each of these mistakes is avoidable with a date on the calendar and a named owner.
- Ordering internet late. Without a live circuit, the new office has desks but no work. Order it in the first phase.
- Sending the COI with the wrong wording. A rejected certificate can block the crew at the door. Get the building's exact requirements before the mover issues it.
- Booking the move before the elevator. A move date means nothing if the freight elevator is already reserved.
- Labeling by name instead of desk number. Names mean nothing to a crew. Desk numbers match the floor plan.
- Ignoring the restoration clause. Cabling removal and wall repairs at the old space take time and can affect your deposit.
- Moving what you should have discarded. Every unneeded cabinet adds packing time, truck space, and unpacking work.
- Splitting ownership. Two people sharing the lead role tends to mean decisions wait for both.
Key Takeaways
- Start about 12 weeks out, and earlier when build-out or furniture orders are involved.
- Lease dates and building access rules set the schedule; confirm both in writing first.
- Order internet at the new address in the first phase and ask for a firm install date.
- Submit the COI as soon as the mover is booked, using the building's exact wording.
- Label by floor, zone, and desk number that match a printed floor plan.
- Give every phase one owner and a clear "done when" condition.
About Office Move Planning
Do employees pack their own desks, or does the mover pack them?
It depends on the scope you contract. A common split is that employees pack personal items and desk contents while the mover handles shared areas, furniture, and equipment. Decide this before you request estimates, because it changes crew size and hours.
Should we move over a weekend or midweek?
Start with what your buildings allow, then weigh the trade-off. A midweek move uses working hours, while an off-hours move may trigger building fees for security or elevator staff. Also confirm the mover actually schedules jobs on the days you are considering.
How long does it take to move a 20-person office?
There is no fixed answer, so ask each mover to estimate crew size and hours from your inventory. The biggest factors are workstation disassembly, elevator and dock access at both buildings, the distance between sites, and how much is packed before the crew arrives.
Written by Born to Move Team
Related Articles
- Office Moving Costs: 8 Line Items to Budget For — How to build a realistic budget for each part of an office move.
- Inside a Weekend Office Relocation: An Hour-by-Hour Timeline — How an off-hours office move is typically sequenced from start to finish.
- Chicago Movers: How to Vet Crews and Compare Quotes — A practical method for comparing movers and their estimates side by side.
- U-Haul vs. Hiring Movers in Boston: A Real Cost and Effort Comparison — What doing it yourself really involves compared with hiring a crew.
Useful Links
- Checklist for a Hassle-Free Move
- How to Reserve an Elevator for Your Move
- What Questions Should I Ask When Hiring a Moving Company?
- Services Typically Offered by a Full-Service Moving Company
Need help with this? Get a quote · Call (617) 903-2609
Frequently Asked Questions